Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u195173488/domains/menxonsgrantenergy.org/public_html/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the salient domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u195173488/domains/menxonsgrantenergy.org/public_html/wp-includes/functions.php on line 6121 NYS LOCAL LAW 97 - Menxons Grant Energy Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/u195173488/domains/menxonsgrantenergy.org/public_html/wp-includes/formatting.php on line 3483
Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/u195173488/domains/menxonsgrantenergy.org/public_html/wp-includes/formatting.php on line 3483 Skip to main content
Mark Chambers, the director of the Mayor’s Office of Sustainability, said that the cumulative cost to building owners to make the upgrades needed to meet the caps would exceed $4 billion. Accordingly, each of aforementioned 60,000 buildings is expected to invest an average of [$4 bn/50,000], i.e. around $80,000.
Also, “Real estate industry executives say that while they support reducing emissions, they believe too many types of buildings were given exemptions, placing an undue burden for reducing the city’s greenhouse gas output on the remaining buildings. Ed Ermler is the board president of a group of four co-op apartment buildings with a total of 437 units in Jackson Heights, Queens. He said that in recent years he has invested hundreds of thousands of dollars to install computerized boiler controls and other systems to make the 1950s-era buildings, called Roosevelt Terrace, more energy efficient, and yet the target that the city has set is still “totally unattainable”. To get down to even 20 percent from where I am today, with the technology that exists, there’s nothing more that I can do,” Mr. Ermler said. “It’s not like there’s this magic wand.””
For all 50,000 building owners in NYC who are expected to spend on average $80,000 to comply with the Act, AG-Burners is in all aspects the best solution available, and for many it is the only one solution practicable. Reducing building’s itheating associated emission by 60% will make fully compliant with emission limits set out in the Act at a fraction cost of any known alternative option. Moreover, Capex associated with AG-Burner retrofitting will in worst case scenario recoup in around one years, the magnitude unimaginable for other options. After this short payback period the owners of a building will have their heating costs reduced by around 60%.